Procedure Review Snapshot
Review Reference: NDT-PR-20260321-MT
Method: MT — Magnetic Particle Testing
Standards: ASME V Art.7 · ASTM E1444 · ASTM E709 · ASNT SNT-TC-1A · AWS D1.1
Date: 2026-03-21
⚠️
CONDITIONAL APPROVAL6 non-compliances require correction before final sign-off
24
Passed
11
Warnings
4
Failed
4
Missing
Procedure NumberQMS-P-007
Revision0
Document TitleProcedure for Magnetic Particle Testing
NDT Method DetectedMT — Magnetic Particle Testing
Standards ApplicableASME Section V Article 7 | ASTM E1444 | ASTM E709 | ASNT SNT-TC-1A | AWS D1.1
Material / Product FormFerromagnetic materials — structural and non-structural welds, drilling/production equipment, raw, semi-finished, and machined surfaces
Industry SectorOil & Gas / Fabrication / Construction
Overall Review StatusCONDITIONAL APPROVAL
Total Compliance Checks43
2
Compliance Review Table
Universal Requirements
Check IDSection TitleStandard Ref.StatusFindingIssueRecommendation
U-1Procedure Number & RevisionASME V T-720 / SNT-TC-1APASSQMS-P-007 Rev 0 dated August 08, 2016 clearly stated on header of each page.NoneNone required
U-2Title and ScopeASME V T-720 / ASTM E1444 §1WARNINGSection 1 covers ferromagnetic materials, weld types, equipment, and multiple surface conditions. Multiple techniques and particle types acknowledged.No explicit limitations sub-section. No minimum material thickness, maximum coating thickness, or temperature range for the overall procedure. No explicit exclusion of non-ferromagnetic materials stated.Add a Limitations sub-section to Section 1 addressing minimum detectable discontinuity depth, material thickness range, coating thickness limits, and confirm prod technique scope status.
U-4Personnel Qualification RequirementsASNT SNT-TC-1A §6 / ASME V T-721PASSSection 3 requires Level II or higher per ASNT SNT-TC-1A and company Written Practice QMS-P-005.None — minimum Level II correctly stated.Consider adding that Level I may assist under direct Level II supervision where Written Practice permits.
U-5Level III ApprovalASNT SNT-TC-1A §6.10 / ASME V T-720(c)WARNINGOriginator: Benjamin Boudreaux, ASNT NDT Level III No. 148993 (UT, MT, VT, PT). Approved by: Corey Navarro, President.Approving signatory has no NDT certification level or number stated. ASME V and SNT-TC-1A require Level III approval in the applicable method. Certification expiry dates absent.Confirm Corey Navarro holds current ASNT MT Level III. If not, obtain re-approval from qualified MT Level III. Add expiry dates for all signatories.
U-12Acceptance / Rejection CriteriaASME V T-760 / ASTM E1444 §9FAILSection 10.2 states the client is responsible for dictating reject criteria and lists applicable codes (API 6A, AWS D1.1, API 1104, API 16A, ASME §VIII, TH Hill DS-1).Critical non-compliance. The procedure contains no defined acceptance/rejection criteria — it defers entirely to the client. No independent quality baseline exists. This fails ASME V T-760, AWS D1.1 Clause 6, and ASTM E1444 §9.For each listed application code, provide specific acceptance criteria table or clause. This is a mandatory correction prior to approval.
U-15Records and RetentionASME V T-790 / ASTM E1444 §10 / SNT-TC-1AMISSINGThe procedure defines report content (Section 11.2) but contains no retention period, format, or custodian statement.Record retention completely absent. ASME V T-790, AWS D1.1, and API standards all require defined retention periods.Add record retention section — minimum 5 years or per applicable construction code/client requirement, whichever is longer. State format and responsible custodian.
Method-Specific Requirements — MT
Check IDSection TitleStandard Ref.StatusFindingIssueRecommendation
MT-2Yoke Lift TestASME V T-730(a) / ASTM E1444 §7.4.3FAILSection 7.4.4 requires AC yoke to lift 10 lb. block at maximum leg spacing. Weight verification every 3 years stated.Lift test frequency inadequate. Procedure only requires lift test within 6-month calibration cycle. ASME V T-730(a) and ASTM E1444 §7.4.3 require: at start of each period of use, after yoke is dropped or damaged, and minimum every 3 months for DC yokes. DC/permanent magnet 40 lb. lift requirement not stated.Add mandatory pre-use (start of shift/job) and post-damage yoke lift test. Add: AC yoke ≥ 10 lb., DC/permanent magnet ≥ 40 lb. Record results in inspection report or equipment log.
MT-4Lighting RequirementsASME V T-721 / ASTM E1444 §7.5FAILSection 7.1.1: White light minimum 100 fc (1,076 lux). Section 7.1.2: UV-A minimum 1,000 µW/cm² at 15 in. Section 7.1.3: Max ambient 2 fc for fluorescent MT.UV-A measurement at 15 inches stated as surrogate but not clarified as measurement at examination surface per ASME V T-721(b). Mandatory recording of light intensity readings at each inspection start is absent.Clarify UV-A intensity must be verified at examination surface or 15 inches per ASTM E1444 §7.5.2. Add requirement to measure and record light intensity at start of each inspection period.
ASME-3Essential VariablesASME V T-721(b)MISSINGNo essential variables list present in QMS-P-007.ASME V T-721(b) mandates essential variables be listed. Any change without procedure re-qualification invalidates the examination. Complete absence is a mandatory gap.Add essential variables table covering: material type, surface condition, magnetisation technique, current type, particle type, equipment, examination medium, and lighting conditions.
MT-9Two Magnetisation DirectionsASME V T-750(a) / ASTM E1444 §7.6.1PASSSection 8.5 mandates two magnetisation directions approximately 90° apart for all areas inspected.Exception "unless otherwise specified by the client in writing" is potentially too broad and could permit non-code-compliant single-direction examination.Restrict exception to cases specifically permitted by the applicable code or client engineering specification, requiring Level III approval and documentation.
3
Non-Compliances Requiring Immediate Attention
Priority 1
[U-12] / [MT-14] — Acceptance / Rejection Criteria Absent
Standard Reference: ASME V T-760 / ASTM E1444 Section 9 / AWS D1.1 Clause 6
The procedure contains no defined acceptance or rejection criteria. Section 10.2 defers entirely to client instruction — no independent quality baseline exists. This fails all referenced standards.
For each application code (API 6A, AWS D1.1, API 1104, API 16A, ASME Section VIII, TH Hill DS-1 Vols 3 & 4), add acceptance criteria by specific clause and table number. This is a mandatory correction.
Priority 2
[MT-2] — Yoke Lift Test Frequency Insufficient
Standard Reference: ASME V T-730(a) / ASTM E1444 Section 7.4.3
The procedure only requires yoke lift verification within the 6-month calibration cycle. ASTM E1444 §7.4.3 and ASME V T-730(a) require per-shift/per-job verification, verification after damage, and minimum every 6 months for calibration — the per-use requirement is absent.
Add mandatory pre-use yoke lift test (start of each shift or job, and after any damage). Add DC/permanent magnet yoke 40 lb. minimum lift requirement. Document results in inspection report.
Priority 3
[ASME-3] — Essential Variables Not Listed
Standard Reference: ASME V T-721(b)
ASME V Article 7 requires the procedure to identify essential variables. No such list exists in QMS-P-007.
Add essential variables table covering all technique families. State that any change requires procedure re-qualification and Level III approval.
Priority 5
[U-15] — Record Retention Requirements Missing
Standard Reference: ASME V T-790 / AWS D1.1 / ASTM E1444 Section 10
No retention period, format requirement, or custodian designation exists. All referenced standards require defined record retention.
Add record retention section: minimum 5 years or per applicable code/client requirement, whichever is greater. State format and custodian.
7
Procedure Review Summary and Recommendations
Overall Assessment
QMS-P-007 Revision 0 is a broadly competent and practically oriented MT procedure demonstrating solid technique coverage across four technique families, thorough reporting requirements, and well-structured particle concentration and field verification requirements. However, critical non-compliances — particularly the complete absence of acceptance/rejection criteria and the missing essential variables list — prevent unconditional approval. These must be corrected before use for any ASME, API, or AWS-governed inspection work.
Recommended Actions Before Approval
  1. [U-12 / MT-14] CRITICAL: Add defined acceptance criteria for each listed application code with specific clause and table references. (ASME V T-760 / ASTM E1444 §9)
  2. [MT-2] CRITICAL: Add mandatory pre-use yoke lift test requirement (start of each shift/job and after damage). Add DC yoke 40 lb. minimum lift requirement. (ASME V T-730(a))
  3. [ASME-3] CRITICAL: Add essential variables table per ASME V T-721(b) for all four technique families. (ASME V T-721(b))
  4. [U-15] CRITICAL: Add record retention section with minimum period, format, and custodian. (ASME V T-790)
  5. [U-5]: Confirm approving signatory holds current ASNT Level III in MT. Add certification numbers and expiry dates for all signatories.
  6. [U-3]: Add all in-text referenced standards to Section 2. Correct clause numbering gap. Update EN-473 reference to ISO 9712:2021.
Level 3 Sign-Off Requirement
This AI-assisted review identifies compliance gaps and provides advisory guidance only. Final procedure approval requires review and sign-off by a qualified NDT Level 3 (ASNT) or PCN/ISO 9712 Level 3 engineer who takes professional responsibility for the approved procedure.
Review Reference: NDT-PR-20260321-MT
Prepared By: NDTVerify AI Review System
Review Date: 2026-03-21
Level 3 Sign-Off