NDT Knowledge Base

NDT Procedure Compliance Guides

Expert articles on ASNT SNT-TC-1A, ASME Section V, ISO 9712, PAUT, and writing NDT procedures that pass Level 3 review.

LEVEL III LEVEL II LEVEL I SNT-TC-1A Written Practice
ASNT SNT-TC-1A Written Practice
How to Write an ASNT SNT-TC-1A Compliant NDT Procedure

A complete guide to the mandatory elements, common gaps, and corrective actions required for ASNT SNT-TC-1A compliant written practice and NDT procedures.

8 min read
Read Article
ASME SECTION V 4 of 5 Articles: COMPLIANT
ASME Section V Checklist
NDT Procedure Review Checklist: ASME Section V Requirements

Every mandatory element required by ASME Section V Articles 1, 4, 5, 6, 7, and 9 — with a practical checklist to catch non-compliances before your Level 3 review.

10 min read
Read Article
ISO 9712 🏛 Third-Party Body ✈ Portable — Yours 🌍 Global Recognition ⏱ 5-Year Renewal PCN / BINDT / CICPND vs ASNT 🏢 Employer Issued 📋 Company-Specific 🇺🇸 US / Canada Focus ⏱ 5-Year Renewal SNT-TC-1A / CP-189
ISO 9712 ASNT PCN Qualification
ISO 9712 vs ASNT SNT-TC-1A: Key Differences for NDT Personnel Qualification

Understand the fundamental differences between ASNT SNT-TC-1A employer-based certification and ISO 9712 / PCN third-party central certification, and which applies to your procedures.

7 min read
Read Article
10 ISSUES ✗ Missing dwell times ✗ No calibration freq. ✗ Vague accept. criteria ✗ Personnel level absent ✗ IQI sensitivity missing ✓ Min/max dwell stated ✓ Every 4hrs + start/end ✓ Clause + paragraph cited ✓ Level II minimum stated ✓ Essential wire visible BEFORE → AFTER CORRECTION
Non-Compliance QA Procedure Writing
10 Most Common NDT Procedure Non-Compliances (and How to Fix Them)

Based on AI review of hundreds of NDT procedures, these are the most frequently found non-compliances across UT, RT, MT, PT, and advanced methods — with exact corrective actions.

9 min read
Read Article
PAUT PROBE defect 40° 50° 60° 70°
PAUT Phased Array Advanced Methods
PAUT Procedure Requirements: A Complete Guide for ASME and ISO Compliance

Phased Array UT procedures face stricter requirements than conventional UT. This guide covers every mandatory element under ASME Code Case 2235, ASME Section V Article 4, and ISO 13588.

11 min read
Read Article
Surface TX Transmitter RX Receiver PCS Lateral Wave Tip Diffraction Backwall Dead Zone
TOFD Advanced Methods ASME
TOFD Procedure Requirements: ASME, ISO 10863 & Common Non-Compliances

Time of Flight Diffraction (TOFD) procedures require specific elements beyond conventional UT — including D-scan documentation, dead zone analysis, and TOFD-specific calibration. This guide covers all mandatory requirements.

9 min read
Read Article
Ir-192 / X-Ray IQI 4.0 2.0 RADIOGRAPH FILM Film Density: 2.0 – 4.0 · SFD: 700 mm Ug = (f × d) / D ≤ 0.51 mm
RT Radiography ASME API
Radiographic Testing Procedure Writing: Complete RT Compliance Guide

A full guide to writing ASME Section V Article 2 and API-compliant RT procedures — covering source selection, IQI calculation, geometric unsharpness, film processing, and the most frequently failed RT procedure elements.

10 min read
Read Article
BOBBIN PROBE Instrument wall loss Fill Factor: 90–98% of Tube ID ID OD
ECT Eddy Current Heat Exchanger
Eddy Current Testing (ECT) Procedure Requirements for Heat Exchanger Inspection

ECT procedures for heat exchanger tube inspection under ASME, API 510, and EPRI guidelines. Covers frequency selection, calibration standards, probe selection, signal analysis, and reporting requirements.

8 min read
Read Article
SDH Notch FBH PROBE QUALIFIED PQR Signed Qualification Mockup Block — Article 14
PQD Qualification ASME Advanced Methods
Procedure Qualification by Demonstration (PQD): ASME Section V Article 14

When written procedure compliance alone is not enough, ASME requires physical demonstration. This guide explains when PQD is mandatory, how to plan a mock-up demonstration, and what your procedure must document.

8 min read
Read Article

Stop Guessing. Get Your Procedure Reviewed.

Upload your NDT procedure PDF. AI reviews it against ASNT, ASME, ISO standards in under 30 minutes.

Start Your First Review — $20